Projects
PROJECT: CONSTRUCTION of DOĞUBAYAZIT WASTE WATER TREATMENT PLANT PROJECT.
LOCATION: AĞRI-DOĞUBAYAZIT-TURKEY
CONTRACTOR: ALKE-ULUOVA-KURAL JOINT VENTURE
POSITION: Contractor's Representative-Project Manager
ENGINEER: TRACTEBEL GKW GMBHH in Consortium with KVM Mühendislik ve Müşavirlik Enerji İnşaat Taah. San. ve Tic. Ltd. Şti., Temelsu International Engineering Services Inc.
END BENEFICIARY: AĞRI-DOĞUBAYAZIT MUNICIPALITY
DATE (FROM –TO): September 2022-Still
FINANCE: Co-financed by the European Union, in accordance with the rules of Multi-annual operational programme "Environment" for Community assistance from the Instrument of Pre-Accession Assistance (IPA-2) for the Regional Development component in Turkey and The Republic of TURKEY. European Union and the European Development Fund (EDF). TR 2018 ESOP MI A1.19 / WKS / 21 (FIDIC YELLOW BOOK CONTRACT) Identification Number: NEAR/ANK/2020/EA-OP/0039.
Construction of Average Flow Rate 18.889 m3/day capacity D.Bayazıt WWTP
PROJECT: CONSTRUCTION of IĞDIR WASTE WATER TREATMENT PLANT PROJECT.
LOCATION: IĞDIR-TURKEY
CONTRACTOR: GEZER-MASS joint Venture
POSITION: Contractor's Representative-Project Manager
ENGINEER: SAFEGE SAS Ankara Central Branch Office (TR) in consortium with SAFAGE (FR) and OPTIMAL
END BENEFICIARY: IĞDIR MUNICIPALITY
DATE (FROM –TO): August 2020-August 2022
FINANCE: Co-financed by the European Union, in accordance with the rules of Multi-annual operational programme "Environment" for Community assistance from the Instrument of Pre-Accession Assistance (IPA-2) for the Regional Development component in Turkey and The Republic of TURKEY. EuropeAid/139897/IH/WKS/TR(IPA-II). TR 2017 ESOP MI A1.10 / WKS / 12 (Fidic Yellow Book Contract).
Construction of Average flow rate 21.000 m3/day capacity Iğdır WWTP
PROJECT: RECONSTRUCTION OF WASTEWATER TREATMENT PLANT, INCLUDING CONSTRUCTION OF SLUDGE DEWATERING FACILITY.
LOCATION: TERNOPIL-UKRAINE
CONTRACTOR: ERCOLE MARELLİ IMPIANTI TECNOLOGICI S.R.L and ATZWAGNER S.p.A CONSORTIUM
POSITION: DEPUTY PROJECT MANAGER
ENGINEER: ENGINEER: EGIS GROUP (Caisse des dépôts et consignations)
END BENEFICIARY: TERNOPIL VODOKANAL
DATE (FROM –TO): May 2019-July 2020
FINANCE: Financed by World Bank Credit (IBRD and CTF LOANS)
Rehabilitation and Construction of 52.000 m3/day capacity Ternopil Waste Water Treatment Plant
PROJECT: CONSTRUCTION and COMPLETION of IV. STAGE ÇİĞLİ-İZMIR WASTE WATER TREATMENT PLANT
LOCATION: IZMIR-TURKEY
CONTRACTOR: MASS ARITMA SİSTEMLERİ İNŞAAT SANAYİ ve TİCARET A.Ş.
POSITION: PROJECT MANAGER
END BENEFICIARY: IZMIR METROPOLITAN MUNICIPALITY
DATE (FROM –TO): September 2018-April 2019
FINANCE: Financed by World Bank Credit (IFC) and İZSU Directorate
Construction of 216.000 m3/day capacity Çiğli-İzmir Waste Water Treatment Plant
PROJECT: CONSTRUCTION of MARDIN NORTHERN and SOUTHERN WASTE WATER TREATMENT PLANT PROJECT.
LOCATION: KIZILTEPE-YEŞİLLİ-MARDIN TURKEY
CONTRACTOR: MASS ARITMA SİSTEMLERİ İNŞAAT SANAYİ ve TİCARET A.Ş.
POSITION: SITE MANAGER to PROJECT MANAGER
ENGINEER: TYPSA S.A-P2M BERLIN-ENVIROPLAN CONSORTIUM
END BENEFICIARY: MARDIN METROPOLITAN MUNICIPALITY
DATE (FROM –TO): April 2016-April 2018
FINANCE: Co-financed by the European Union, in accordance with the rules of Multi-annual operational programme "Environment" for Community assistance from the Instrument of Pre-Accession Assistance (IPA) for the Regional Development component in Turkey and The Republic of TURKEYEuropeAid /136218/IH/WKS/TR (IPA-I) (FIDIC YELLOW BOOK CONTRACT)
Construction of 64.657 m3/day capacity South (Kızıltepe) Waste Water Treatment Plant
Construction of 12.054 m3/day capacity North (Yeşilli) Waste Water Treatment Plant
PROJECT: CONSTRUCTION of ADIYAMAN WASTE WATER TREATMENT PLANT and WASTEWATER COLLECTOR MAINS
LOCATION: ADIYAMAN-TURKEY
CONTRACTOR: PASSAVANT-ROEDIGER ENERGY GMBH- SEÇ YAPI Consortium
POSITION: SITE MANAGER
ENGINEER: FİCHTNER W&T-DORSCH-SU YAPI JV
END BENEFICIARY: ADIYAMAN MUNICIPALITY
DATE (FROM –TO): October 2013-December 2015
FINANCE: Co-financed by the European Union, in accordance with the rules of Multi-annual operational programme "Environment" for Community assistance from the Instrument of Pre-Accession Assistance (IPA) for the Regional Development component in Turkey and The Republic of TURKEY EuropeAID/130110/D/WKS/TR (IPA-I) (FIDIC YELLOW BOOK CONTRACT)
Construction of 35.000 m3/day capacity Adıyaman Waste Water Treatment Plant
Construction of 40 km of collector lines Concrete (Dn1200- Dn800) and Hdpe pipes (Dn150-Dn400), Main pumping station including screen building, transformer building, odour unit, 5 new pumping stations, 1 km siphon lines including Inlet structure, Screen and Grit channel
PROJECT: CONSTRUCTION and UPGRADING of IASI WWTP
LOCATION: IASI-ROMANIA
CONTRACTOR: ERCOLE MARELLI IMPIANTI TECNOLOGICI S.P.A
POSITION: CIVIL WORKS MANAGER
END BENEFICIARY: S.C. APAVITAL S.A.
DATE (FROM –TO): July 2012-October 2013
FINANCE: European Union EBRD Funds
Construction and Rehabilitation of existing 54.000 m3/day capacity Iaşi I.stage line WWTP
PROJECT: CONSTRUCTION of SAADIYAT ISLAND WWTP
LOCATION: ABU DHABI-UNITED ARAB EMIRATES
CONTRACTOR: KHARAFI NATIONAL-ERCOLE MARELLI IMPIANTI TECNOLOGICI S.P.A
ENGINEER: PARSONS (USA)
POSITION: SUPERVISOR ENGINEER
END BENEFICIARY: ABU-DHABI SEWERAGE SERVİCE COMPANY (T.D.I.C)
DATE (FROM –TO): October 2011-June 2012
Construction of 78.000 m3/day capacity Saadiyat Island Wastewater and Potable Water Treatment Plants
PROJECT: CONSTRUCTION and REHABILITATION of CRAIOVA WWTP.
LOCATION: CRAIOVA-ROMANIA
CONTRACTOR: ERCOLE MARELLI IMPIANTI TECNOLOGICI S.P.A
POSITION: SITE MANAGER
ENGINEER: EPTİSA S.A
END BENEFICIARY: COMPANIA de APA OLTENIA (C.A.O.)
DATE (FROM –TO): May 2009-September 2011
FINANCE: Financed by ISPA (EU) (FIDIC YELLOW BOOK CONTRACT)
Construction and Rehabilitation of 129.600 m3/day capacity Craiova Waste Water Treatment Plant
PROJECT: CONSTRUCTION of KARADUVAR WWTP and COLLECTOR MAINS
LOCATION: KARADUVAR-MERSIN-TURKEY
CONTRACTOR: ERCOLE MARELLI IMPIANTI TECNOLOGICI S.P.A and SISTEM YAPI CONSTRUCTION Consortium.
POSITION: SITE ENGINEER
ENGINEER: DAHLEM-CES-TEMPO JV
END BENEFICIARY: MERSIN METROPOLITAN MUNICIPALITY
DATE (FROM –TO): August 2008-May 2009
FINANCE: Founded by Europa Investment Bank Credit (EIB and KFW) (FIDIC SILVER BOOK CONTRACT)
Construction of 190.000 m3/day capacity Karaduvar Waste Water Treatment Plant
Construction of 10 km twin force main west collector lines (2xDn1600 Grp pipes)
Construction of 23 km twin force main east collector lines (2xDn630 and Dn560 Hdpe pipes)
CONSTRUCTION of SIIRT WWTP (LOT 3)
LOCATION: SIIRT-TURKEY
CONTRACTOR: SISTEM YAPI CONSTRUCTION-SEOM CONSTRUCTION
POSITION: SITE ENGINEER
ENGINEER: DORSCH CONSULT WASSER & UMWELT GmbH-SU YAPI CONSORTIUM
END BENEFICIARY: SIIRT MUNICIPALITY
DATE (FROM –TO): July 2007-August 2008
FINANCE: Financed by Kreditanstalt für Wiederaufbau (KfW) (FIDIC YELLOW BOOK CONTRACT)
Construction of 20.000 m3/day-148.000 P.E capacity Siirt Waste Water Treatment Plant