Projects

PROJECT: CONSTRUCTION of DOĞUBAYAZIT WASTE WATER TREATMENT PLANT PROJECT.

LOCATION: AĞRI-DOĞUBAYAZIT-TURKEY

CONTRACTOR: ALKE-ULUOVA-KURAL JOINT VENTURE

POSITION: Contractor's Representative-Project Manager

ENGINEER: TRACTEBEL GKW GMBHH in Consortium with KVM Mühendislik ve Müşavirlik Enerji İnşaat Taah. San. ve Tic. Ltd. Şti., Temelsu International Engineering Services Inc.

END BENEFICIARY: AĞRI-DOĞUBAYAZIT MUNICIPALITY

DATE (FROM –TO): September 2022-Still

FINANCE: Co-financed by the European Union, in accordance with the rules of Multi-annual operational programme "Environment" for Community assistance from the Instrument of Pre-Accession Assistance (IPA-2) for the Regional Development component in Turkey and The Republic of TURKEY. European Union and the European Development Fund (EDF). TR 2018 ESOP MI A1.19 / WKS / 21 (FIDIC YELLOW BOOK CONTRACT) Identification Number: NEAR/ANK/2020/EA-OP/0039.

Construction of Average Flow Rate 18.889 m3/day capacity D.Bayazıt WWTP

PROJECT: CONSTRUCTION of IĞDIR WASTE WATER TREATMENT PLANT PROJECT.
LOCATION: IĞDIR-TURKEY

CONTRACTOR: GEZER-MASS joint Venture

POSITION: Contractor's Representative-Project Manager

ENGINEER: SAFEGE SAS Ankara Central Branch Office (TR) in consortium with SAFAGE (FR) and OPTIMAL

END BENEFICIARY: IĞDIR MUNICIPALITY

DATE (FROM –TO): August 2020-August 2022

FINANCE: Co-financed by the European Union, in accordance with the rules of Multi-annual operational programme "Environment" for Community assistance from the Instrument of Pre-Accession Assistance (IPA-2) for the Regional Development component in Turkey and The Republic of TURKEY. EuropeAid/139897/IH/WKS/TR(IPA-II). TR 2017 ESOP MI A1.10 / WKS / 12 (Fidic Yellow Book Contract).

Construction of Average flow rate 21.000 m3/day capacity Iğdır WWTP

PROJECT: RECONSTRUCTION OF WASTEWATER TREATMENT PLANT, INCLUDING CONSTRUCTION OF SLUDGE DEWATERING FACILITY.
LOCATION: TERNOPIL-UKRAINE

CONTRACTOR: ERCOLE MARELLİ IMPIANTI TECNOLOGICI S.R.L and ATZWAGNER S.p.A CONSORTIUM

POSITION: DEPUTY PROJECT MANAGER

ENGINEER: ENGINEER: EGIS GROUP (Caisse des dépôts et consignations)

END BENEFICIARY: TERNOPIL VODOKANAL

DATE (FROM –TO): May 2019-July 2020

FINANCE: Financed by World Bank Credit (IBRD and CTF LOANS)

Rehabilitation and Construction of 52.000 m3/day capacity Ternopil Waste Water Treatment Plant

PROJECT: CONSTRUCTION and COMPLETION of IV. STAGE ÇİĞLİ-İZMIR WASTE WATER TREATMENT PLANT

LOCATION: IZMIR-TURKEY

CONTRACTOR: MASS ARITMA SİSTEMLERİ İNŞAAT SANAYİ ve TİCARET A.Ş.

POSITION: PROJECT MANAGER

END BENEFICIARY: IZMIR METROPOLITAN MUNICIPALITY

DATE (FROM –TO): September 2018-April 2019

FINANCE: Financed by World Bank Credit (IFC) and İZSU Directorate

Construction of 216.000 m3/day capacity Çiğli-İzmir Waste Water Treatment Plant

PROJECT: CONSTRUCTION of MARDIN NORTHERN and SOUTHERN WASTE WATER TREATMENT PLANT PROJECT.

LOCATION: KIZILTEPE-YEŞİLLİ-MARDIN TURKEY

CONTRACTOR: MASS ARITMA SİSTEMLERİ İNŞAAT SANAYİ ve TİCARET A.Ş.

POSITION: SITE MANAGER to PROJECT MANAGER

ENGINEER: TYPSA S.A-P2M BERLIN-ENVIROPLAN CONSORTIUM

END BENEFICIARY: MARDIN METROPOLITAN MUNICIPALITY

DATE (FROM –TO): April 2016-April 2018

FINANCE: Co-financed by the European Union, in accordance with the rules of Multi-annual operational programme "Environment" for Community assistance from the Instrument of Pre-Accession Assistance (IPA) for the Regional Development component in Turkey and The Republic of TURKEYEuropeAid /136218/IH/WKS/TR (IPA-I) (FIDIC YELLOW BOOK CONTRACT)

Construction of 64.657 m3/day capacity South (Kızıltepe) Waste Water Treatment Plant

Construction of 12.054 m3/day capacity North (Yeşilli) Waste Water Treatment Plant

PROJECT: CONSTRUCTION of ADIYAMAN WASTE WATER TREATMENT PLANT and WASTEWATER COLLECTOR MAINS

LOCATION: ADIYAMAN-TURKEY

CONTRACTOR: PASSAVANT-ROEDIGER ENERGY GMBH- SEÇ YAPI Consortium

POSITION: SITE MANAGER

ENGINEER: FİCHTNER W&T-DORSCH-SU YAPI JV

END BENEFICIARY: ADIYAMAN MUNICIPALITY

DATE (FROM –TO): October 2013-December 2015

FINANCE: Co-financed by the European Union, in accordance with the rules of Multi-annual operational programme "Environment" for Community assistance from the Instrument of Pre-Accession Assistance (IPA) for the Regional Development component in Turkey and The Republic of TURKEY EuropeAID/130110/D/WKS/TR (IPA-I) (FIDIC YELLOW BOOK CONTRACT)

Construction of 35.000 m3/day capacity Adıyaman Waste Water Treatment Plant

Construction of 40 km of collector lines Concrete (Dn1200- Dn800) and Hdpe pipes (Dn150-Dn400), Main pumping station including screen building, transformer building, odour unit, 5 new pumping stations, 1 km siphon lines including Inlet structure, Screen and Grit channel

PROJECT: CONSTRUCTION and UPGRADING of IASI WWTP

LOCATION: IASI-ROMANIA

CONTRACTOR: ERCOLE MARELLI IMPIANTI TECNOLOGICI S.P.A

POSITION: CIVIL WORKS MANAGER

END BENEFICIARY: S.C. APAVITAL S.A.

DATE (FROM –TO): July 2012-October 2013

FINANCE: European Union EBRD Funds

Construction and Rehabilitation of existing 54.000 m3/day capacity Iaşi I.stage line WWTP

PROJECT: CONSTRUCTION of SAADIYAT ISLAND WWTP

LOCATION: ABU DHABI-UNITED ARAB EMIRATES

CONTRACTOR: KHARAFI NATIONAL-ERCOLE MARELLI IMPIANTI TECNOLOGICI S.P.A

ENGINEER: PARSONS (USA)

POSITION: SUPERVISOR ENGINEER

END BENEFICIARY: ABU-DHABI SEWERAGE SERVİCE COMPANY (T.D.I.C)

DATE (FROM –TO): October 2011-June 2012

Construction of 78.000 m3/day capacity Saadiyat Island Wastewater and Potable Water Treatment Plants

PROJECT: CONSTRUCTION and REHABILITATION of CRAIOVA WWTP.

LOCATION: CRAIOVA-ROMANIA

CONTRACTOR: ERCOLE MARELLI IMPIANTI TECNOLOGICI S.P.A

POSITION: SITE MANAGER

ENGINEER: EPTİSA S.A

END BENEFICIARY: COMPANIA de APA OLTENIA (C.A.O.)

DATE (FROM –TO): May 2009-September 2011

FINANCE: Financed by ISPA (EU) (FIDIC YELLOW BOOK CONTRACT)

Construction and Rehabilitation of 129.600 m3/day capacity Craiova Waste Water Treatment Plant

PROJECT: CONSTRUCTION of KARADUVAR WWTP and COLLECTOR MAINS

LOCATION: KARADUVAR-MERSIN-TURKEY

CONTRACTOR: ERCOLE MARELLI IMPIANTI TECNOLOGICI S.P.A and SISTEM YAPI CONSTRUCTION Consortium.

POSITION: SITE ENGINEER

ENGINEER: DAHLEM-CES-TEMPO JV

END BENEFICIARY: MERSIN METROPOLITAN MUNICIPALITY

DATE (FROM –TO): August 2008-May 2009

FINANCE: Founded by Europa Investment Bank Credit (EIB and KFW) (FIDIC SILVER BOOK CONTRACT)

Construction of 190.000 m3/day capacity Karaduvar Waste Water Treatment Plant

Construction of 10 km twin force main west collector lines (2xDn1600 Grp pipes)

Construction of 23 km twin force main east collector lines (2xDn630 and Dn560 Hdpe pipes)

CONSTRUCTION of SIIRT WWTP (LOT 3)

LOCATION: SIIRT-TURKEY

CONTRACTOR: SISTEM YAPI CONSTRUCTION-SEOM CONSTRUCTION

POSITION: SITE ENGINEER

ENGINEER: DORSCH CONSULT WASSER & UMWELT GmbH-SU YAPI CONSORTIUM

END BENEFICIARY: SIIRT MUNICIPALITY

DATE (FROM –TO): July 2007-August 2008

FINANCE: Financed by Kreditanstalt für Wiederaufbau (KfW) (FIDIC YELLOW BOOK CONTRACT)

Construction of 20.000 m3/day-148.000 P.E capacity Siirt Waste Water Treatment Plant